Description of Project / Work |
Details of Highway construction, improvement and
pavement reconstruction |
|
08/2007 |
Present |
Sub agent |
City of Dreams, Macau
Construction of a 502,000 sqm luxury resort casino
complex comprising 5 high towers and a 3 storey podium. Hotels: Hard
Rock (46,850m2, 24 floors, 366 rooms), Grand Hyatt (52,850m2, 30 floors,
350 rooms), Hyatt Regency (80,660 m2 26 floors, 660 rooms), Crown
(72,930m2, 31 floors, 295 rooms), Apartment Hotel (136,475m2, 37 floors,
861 rooms), Dragon Theatre (23,3743m2), podium for casino/retail and
food and beverage 187,740m2. |
External and Landscaping Works of Hotels, including
drainage and pavement construction |
|
04/2003 |
08/2007 |
Sub agent |
Central Reclamation Phase III - Engineering Works
Reclamation of 18 hectares of land, construction of
seawalls, ferry piers, a railway overrun tunnel, a dual three-lane road
tunnel, a heliport, cooling water pumping stations and pipelines, roads
and drainage and various M&E works. |
Site formation and construct the associated road and
drainage works, including the extension of a 4 cell box culvert to the
new seafront |
|
02/2001 |
04/2003 |
Sub agent |
KCRC Contract CC-230, Light Rail Civil, Permanent Way,
Traction Power and Overhead Line
Light rail civil and systems works for interchange
stations, Tin Shui Wai Phase 4 and Tin Shiu Wai reserve zone extension,
Light Rail grade separations at Pui To Road, junction LT1 and junction
L, modifications to the existing system. |
Diversion and re-construction of existing road and
modification of existing drainage and sewage system to allow the
construction of new Light Rail |
|
04/1999 |
02/2001 |
Sub agent |
Tseung Kwan O Extension - MTRCL 607 Tseung Kwan O Station
and Tunnels
Construction of an underground station, two cut and cover
tunnels, a public transport interchange and associated substructures, as
well as roadworks adjacent to the station. (project size: 20,000 m2) |
Tunnel structures and road works adjacent to the station |
|
03/1997 |
04/1999 |
Sub agent |
Redevelopment of Tsz Oi Estate Phase 4
Construction of six 41-storey residential blocks,
comprising 1,920 flats, carpark, kindergarten, footbridges (including
foundations) and external works. (GFA 185,000 m2) |
All external works including the road, drainage and
sewage system connected to the existing system |
|
02/1996 |
03/1997 |
Sub agent |
LSG Catering Facility at Chek Lap Kok
Design and construction of a 20,500 m2, 3-level facility
incorporating production and returns areas, storage, administration and
maintenance facilities and procurement management of all specialist
equipment |
All external works including the road, drainage and
sewage system tied in to the main road and drainage system |
|
07/1995 |
02/1996 |
Sub agent |
Explosives' Complex - Stage 1 Civil Works
Construction of access tunnels and ten caverns by drill
and blast, reinforced-concrete cavern structures, blast walls, portal
formation, dredging, reclamation, seawalls and site formation at Kau
Shat Wan, Lantau Island. |
Site formation, road and drainage works |
|
07/1994 |
06/1995 |
Sub agent |
Wanchai Reclamation Phase 1 Reclamation & West Bridge
Dredging, reclamation, seawalls, bridge, pumphouses and
H-pile foundations for the extension to the Hong Kong Convention and
Exhibition Centre. |
Tie in road and drainage works to existing system |
|
03/1992 |
06/1994 |
Senior engineer |
West Kowloon Reclamation Northern
Area - Phase II
Reclamation of 100 hectares involving dredging of 4.2
million m3, deposition of 20 million m3 of sand fill, 1.4 km of seawall,
drainage, demolition, roadworks, foundations and pipelines. |
Seawall construction and temporary site access road |
|
06/1990 |
02/1992 |
Senior engineer |
North-west Kowloon sewage treatment and disposal project.
Project involved 2,000 mm steel sewage pipes laying and pump station
access chamber structure. |
Laying 2000mm diameter MS underground pipe and construct
road and pavement |
|
07/1988 |
05/1990 |
Senior engineer |
Flyover and subways for Hong Kong Island eastern corridor
phase 3. Project involved flyover, subway structure, footbridge, slope
protection works. |
Construction of flyover and subway structures for Hong
Kong Island Eastern Corridor from Sha Kei Wan to Chai Wan |
|
07/1987 |
06/1988 |
Section engineer |
Construction of Guangzhou Shenzhen ¡V Zhuhai super highway |
Road and drainage construction from Guangzhou to Shenzhen |
|
04/1986 |
06/1987 |
Site agent |
Slope improvement and road and bridge construction for
phase 2 of Tai Po Road Improvement. Project involved slope improvement,
protection, soil nails, retaining walls, road and drainage
reconstruction, footbridge and car park. |
To modify Tai Po Road by re-construction of existing road
and drainage, building new footbridge, car park and retaining wall |
|
06/1981 |
03/1986 |
Site agent |
Reclamation, seawall and road construction at Shatin.
Project involved seawall construction, seawall block casting yard and
box culvert structure |
Road and drainage work, including box culvert
construction |
|
11/1978 |
05/1981 |
Site engineer |
Road and drainage work, subway construction and
landscaping works in Shatin |
In charge of all quantity surveying for road and drainage
on site |
|
09/1977 |
10/1978 |
Site engineer |
Reclamation works, road and drainage work at Tuen Mun |
In charge of a site laboratory, carrying out tests on
site formation and concrete cubes test for concrete structure |